
A shop floor takes loads a house slab never sees: a hoist, a loaded trailer, a skid steer turning in one spot. The section and the reinforcement get sized for that rather than for a garage.
If you are putting in-floor heat down, the tubing goes in before the pour and the tie-down and the pressure test happen before anybody places concrete. We coordinate that with your plumber rather than pouring around a problem.
Vapour barrier under everything that will ever be heated or finished. It is a cheap thing to skip and an expensive thing to have skipped.
Where we do this work
Shop & Garage Slabs across the whole valley. If you are in one of these, Heath will come and look at it.